Skip to content

Katerini Sewage Treatment Plant

Katerini, Greece

Project Category: Water Treatment & Storage

Description

The wastewater treatment plant was built in Katerini (population: 84,000) to treat the city’s entire sewage volume.

Products Used

Due to concern about possible leakage through the cold joints in the concrete, over 3,000m of PENEBAR SW 45 with PENEBAR PRIMER was installed as a waterproofing barrier to prevent seepage. PENETRON was also applied to waterproof 26,000m² of concrete.

Products used